
Add to Cart
600BPH Water Filling Equipment 5 Gallon 18.9L Filling Machine Production Line
this is 5 gallon water production line, capacity is 600BPH,
includes:
1. decapper;
2. internal&external brushing machine;
3. rinsing filling capping machine;
4. labeling machine;
5. shrinking maching;
6. bagging machine
internal&external brushing machine
rinsing filling capping machine
bagging machine
We have different capacities
Model | QGF-120 | QGF-300 | QGF-450 | QGF-600 | QGF-900 |
Filling Heads | 1 | 2 | 3 | 4 | 6 |
Capacity | 150 | 300 | 450 | 600 | 900 |
Volume(gallon) | 18.9 | 18.9 | 18.9 | 18.9 | 18.9 |
Barrel size (mm) | φ 270 x 490 | φ 270 x 490 | φ 270 x 490 | φ 270 x 490 | φ 270 x 490 |
Capacity(b/h) | 120 | 300 | 450 | 600 | 900 |
Gas Pressure(Mpa) | 0.4 - 0.6 | 0.4 - 0.6 | 0.4 - 0.6 | 0.6 | 0.6 |
Gas Consumption (m3/min) | 0.37 | 0.6 | 0.8 | 1 | 1.5 |
Moto Power(kw) | 1.38 | 3.8 | 3.8 | 7.5 | 9.75 |
Rated Voltage | 380V/50HZ | 380V/50HZ | 380V/50HZ | 380V/50HZ | 380V/50HZ |
Weight(kg) | 680 | 1500 | 2100 | 3000 | 3500 |
Q1.Where is your factory located? How can I visit there?
A1:Our factory is located in Zhangjiagang city,Jiangsu province, China, All our clients, from home
or abroad, are warmly welcome to visit us!
Q2.What products does your company offer by yourself?
A2:We are specialized in RO water treatment machines, UF water treatment machines,small bottle
filling machines and 5 gallon filling machines.
Q3: How can I know your machine works well?
A3: Before delivery, we shall test the machine working condition for you.
Q4: When can I get my machine after I paid?
A4: Normally production time is around 15-25 working days, the exactly depend on what kind of machine
you order. The shipping time is based on your destination port.
Q5:How long of your warranty?
A5:Regarding warranty, normally we offer 1 year warranty, and we also offer lifetime maintenance.
Our professional teams are waiting for your inquiry... ...